Body Instruction No. 03/2023-Customs, F.No. 401/35/2022-Cus-III, Dated 27th January, 2023

Government of India

Ministry of Finance

Department of Revenue

(Central Board of Indirect Taxes & Customs)

To

All Principal Chief Commissioners/ Chief Commissioner of Customs

All Principal Chief Commissioners/ Chief Commissioner of Customs! Preventive)

All Principal Chief Commissioners/ Chief Commissioner of C GST & Customs

All Principal Director Generals /Director Generals under CBIC

All Principal Commissioners I Commissioners of Customs

Subject: - Cancellation of swapping order w.r.t. 8th & 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and holding of export quota-regarding

Please refer to Instruction No. 33/2022 dated 12.12.2022 on the above subject.

2. Vide F.No. 1-1/(2022)-Trade letter dated 23.01.2023 (copy enclosed). Department of Food & Public Distribution (DFPD), Ministry of Consumer Affairs. Food & Public Distribution has informed about cancellation of the following sugar mills till further orders in reference to its 8th & 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and holding f export quota as under: -

i. SI. No. T of 8th reallocation order dated 26.12.2022 (page 96).

SI. No. Plant Code Plant Name Export Quota (in MT)
1 35401 BIJAPUR 14403
2 52901 HAVARGAON 4696

i. SI. No. '25' of 9th reallocation order dated 02.01 .2023 (page 98):-

SI. No. Plant Code Plant Name Export Quota (in MT)
1 35401 HAVARGAON 4696
2 35501 SANT DHAMAJI 5497

3. Accordingly, DFPD has advised to put on hold export quotas of above mentioned sugar mills and to not allow export of sugar from the above-mentioned 3 sugar till further orders.

4. It is requested that necessary action may be taken to sensitize officers under your jurisdiction for compliance of the above order of DFPD.

Encl : as above

(Manish Kumar Choudhary)

Joint Commissioner (Customs-Ill)

Email: manish.irsugov.in

Tele:011 23094012

F.No. 1-1/(2022)-Trade

Government of India

Ministry of Consumer Affairs, Food & Public Distribution

Department of Food & Public Distribution (DFPD)

Krishi Bhawan, New Delhi

Dated the 23rd January 2023

To

CBIC, Department of Revenue.

Subject: Cancellation of swapping order w.r.t. 8th & 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and holding of export quota.

I am directed to refer to the 8th & 9th reallocation order dated 26.12.2022 & 02.01.2023 respectively (copy enclosed) and to say that reallocation orders for the following sugar mills stands cancelled till further orders:-

i. SI. No. T of 8th reallocation order dated 26.12.2022,

SI. Plant Code Plant Name Export Quota (in MT)
1 35401 BIJAPUR 14403
2 52901 HAVARGAON 4696

i. SI. No. '25' of 9th reallocation order dated 02.01.2023:-

SI. Plant Code Plant Name Export Quota (in MT)
1 52901 HAVARGAON 4696
2 35501 SANT DHAMAJI 5497

2. The export quotas of above mentioned sugar mills have been put on hold.

3. Further, it may kindly be ensured that the above-mentioned 3 sugar mills should not export any sugar till further orders of this Directorate.

Yours faithfully,

(Dilip Kumar Jha)

Under Secretary to the Govt, of India,

Tele: 011-23380552

F.No. 1-1/(2022)-Trade

Government of India

Ministry of Consumer Affairs, Food & Public Distribution

Department of Food & Public Distribution (DFPD)

Krishi Bhawan, New Delhi

Dated the 26 December 2022

To

The CEO/MD/GM of Sugar mills.

(As per list attached)

Subject: 8th Reallocation of Export Quota for export during Sugar Season 2022-23 and consequent adjustment of Monthly release quantity on account of exchange of export quantity with domestic monthly release quantity.

In order to prevent uncontrolled export of sugar & with a view to ensure sufficient availability of sugar for domestic consumption at a reasonable price, Government has decided to allow export of sugar up to a reasonable limit w.e.f 01.11.2022 till 31.10.2023. Directorate General of Foreign Trade (DGFT), Ministry of Commerce vide Notification No. 40/2015-20 dated 28.10.2022 has also amended export policy in respect of sugar.

2. Subsequently, DFPD vide letter of even number dated 05.11.2022 has allocated export quota of 60 LMT to sugar mills for sugar season 2022-23 w.e.f. 01.11.2022 along with the guidelines for export of sugar.

3. As per clause 'E' of the guidelines dated 05.11.2022, DFPD has decided to allow exchange of Export quantity from the quantity of monthly release quota. In this regard, representations along with agreements between sugar mills involved in exchange of their Export quantity and domestic monthly release quantity have been examined in this Department and accordingly additional export quantity has been allocated and domestic quota of the sugar mills have also been adjusted as mentioned in Annexure.

(Sangeet)

Director (Sugar)

Tele: 23383760

8th Reallocation

(Quantity in MT)

  Mills surrendering Export Quota 2022-23 Mills surrendering Domestic Sales Quota  
SI. No Plant Code Plant Name Export Quota as on 26.12.2022 Export Quota Surrender ed Revised Export Quota Plant Code Plant Name Export Quota as on 26.12.2 022 Revised Export Quota Deduction to be made from domestic quota
1 35401 BIJAPUR 14403 14403 0 52901 HAVARGAON 4696 19099 8 equal installment of 1600 MT from Jan 2023 to Aug 2023 and 1603 MT in Sept 2023 for transferring to BIJAPUR/35401
2 3501 SHAMLI 12000 12000 0 17901

 

PHALTAN

 

13130

 

36018

 

4 equal installment of 3000 MT from Jan 2023 to April 2023 for transferring to SHAMLI/3501
3 30701 PONNI 10888 10888 0 4 equal installment of 2722 MT from May 2023 to August 2023 for transferring to PONNI/30701
4 48501 RUPAPUR 8000 8000 0 15401 SANGLI 70387 78387 4 equal installment of 2000 MT from Jan 2023 to April 2023 for transferring to RUPAPUR/48501
5 5801 DHAMPUR 45000 20000 25000 37501 SAMSHERPUR 43335 63335 5 equal installment of 3333 MT from Jan 2023 to May 2023 & 3335 MT for June, 23 for transferring to DHAMPUR/5801
6 6001 RAJAKA SAHASPUR 13770 13770 0 38801

 

 

 

KOREGAON

 

 

 

113297

 

 

 

155486

 

 

 

9 equal installment of 1530 MT from Jan 2023 to Sept 2023 for transferring to RAJAKA SAHASPUR/6001
7 67601 KARIMGANJ 13220 13220 0 8 equal installment of 1468 MT from Jan 2023 to Aug 2023 & 1476 MT for Sept, 23 for transferring to KARIMGANJ/67601
8 58301 RANINANGAL 23830 8430 15400 3 equal installment of 2810 MT from Jan 2023 to March 2023 for transferring to RANINANGAL/58301
9 3001 DEOBAND 31769 6769 25000 2257 MT for Jan, 2257 MT for Feb, 23 and 2255 MT for March, 23 for transferring to DEOBAN D/3001
10

 

56101

 

THANABHAWAN

 

27200

 

25000

2200

0

 

46801 MURUM 9828 34828 5 equal installment of 5000 MT from Jan 2023 to May 2023 for transferring to THANABHAWAN/56101
12701 PRAVARANAGAR 36828 39028 8 equal installment of 275 MT from Jan 2023 to Aug 2023 for transferring to THANABHAWAN/56101
11 6601 BAHERI 22063 22063 0 63501 HAVINAL 5144 27207 8 equal installment of 2451 MT from Jan 2023 to Aug 2023 and 2455 MT in Sept 2023 for transferring to BAHERI/6601
        156743           156743

F.No. 1-1/(2022)-Trade

Government of India

Ministry of Consumer Affairs, Food & Public Distribution

Department of Food & Public Distribution (DFPD)

Krishi Bhawan, New Delhi

Dated the 02nd January 2023

To

The CEO/MD/GM of Sugar mills

(As per list attached)

Subject: 9th Reallocation of Export Quota for export during Sugar Season 2022-23 and consequent adjustment of Monthly release quantity on account of exchange of export quantity with domestic monthly release quantity.

In order to prevent uncontrolled export of sugar & with a view to ensure sufficient availability of sugar for domestic consumption at a reasonable price, Government has decided to allow export of sugar upto a reasonable limit w.e.f 01.11.2022 till 31.10.2023. Directorate General of Foreign Trade (DGFT), Ministry of Commerce vide Notification No. 40/2015-20 dated 28.10.2022 has also amended export policy in respect of sugar.

2. Subsequently, DFPD vide letter of even number dated 05.11.2022 has allocated export quota of 60 LMT to sugar mills for sugar season 2022-23 w.e.f. 01.11.2022 along with the guidelines for export of sugar.

3. As per clause 'E' of the guidelines dated 05.11.2022, DFPD has decided to allow exchange of Export quota quantity from the quantity of monthly release quota. In this regard, representations along with agreements between sugar mills involved in exchange of their Export quota quantity and domestic monthly release quantity have been examined in this Department and accordingly additional export quantity has been allocated and domestic quota of the sugar mills will be adjusted as mentioned in Annexure.

Yours faithfully,

(Sangeet)

Director (Sugar)

Tele: 23383760

Annexure

9th Reallocation

(Figures in MT)

  Mills surrendering Export Quota 2022-23 Mills surrendering Domestic Sales Quota
s. No. Plant Code Plant Name Export Quota as on 02.01.2023 Export Quota surrendered Revised Export Quota Plant Code Plant Name Export Quota as on 02.01.2023 Revised Export Quota Adjustment in the domestic quota
1

 

 

 

37701

 

 

 

NARAINGARH

 

 

 

9744

 

 

 

4200 0

 

 

 

52801 BHILARWADI 3640 7840 5 equal installment of 840 MT from Feb 2023 to June 2023 for transferring to Naraingarh /37701
2880 69039 RAVADEWADI 20074 22954 500 MT in Feb, 500 MT in March, 750 MT in April, 23, 751 Mt IN May, 23 and 379 MT in June, 23 for transferring to Naraingarh /37701
1249 14901 KRISHNA 26439 27688 1000 MT in Feb,23 and 249 MT in march for transferring to Naraingarh /37701
1415 54901

 

GAGAN

 

10388

 

15788

 

2 equal installment of 500 MT from July 2023 to August 2023 and 415 MT in the month of Sep for transferring toNaraingarh /37701
2

 

 

34201

 

 

MUKERIAN

 

 

6145

 

 

3985 0

 

 

2 equal installment of 1300 MT from July 2023 to August 2023 and 1385 MT in the month of Sep for transferring to Mukerian/34201
1080 40201 PARTUR 10504 11584 2 equal installment of 540 MT from April 2023 and May 2023 for transferring to Mukerian/34201
1080 69017

 

BALIRAJA-PURNA

 

13807

 

15967

 

2 equal installment of 540 MT from April 2023 and May 2023 for transferring to Mukerian/34201
3

 

 

 

6501

 

 

 

PALIAKALAN

 

 

 

8000

 

 

 

1080 0

 

 

 

2 equal installment of 540 MT from Feb 2023 to March,23 for transferring to Paliakalan 76501 (Partur/40201)
1080 40201 PARTUR 11584 12664 2 equal installment of 540 MT from Feb, 23 to March, 23 for transferring toPaliakalan /6501
4389 14501 GURSALE 4873 9262 450 MT in the month of Feb 2023 ,650 MT in May2023, 3 equal installment of 700 MT from June to August and 1189 MT in Sep for transferring toPaliakalan /6501
1451 14901 KRISHNA

 

27688

 

31839

 

700 MT in the month of Feb and 751 MT in April for transferring to Paliakalan /6501
4

 

 

 

 

42202

 

 

 

 

BHADSON

 

 

 

 

6844

 

 

 

 

2700 0

 

 

 

 

1700 MT in the month of Feb and 1000 MT in April for transferring to Bhadson/42202  
540 69017 BAL1RAJA-PURNA 15967 16507 540 MT in the month of Feb 2023 for transferring to Bhadson /42202
1600 14501 GURSALE 9262 .. 10862 450 MT in the month of Feb 2023 ,500 MT in March 1 2023, and 650 MT in April for transferring to Bhadson /42202
1464 69039 RAVADEWADI 22954 24418 750 MT in the month of March and 714 MT in April for transferring to Bhadson /42202
540 40201 PARTUR 12664 13204 540 MT in the month of Feb 2023 for transferring to Bhadson /42202
5 60301 MAQSUDPUR 14290 3012 11278 61601

 

UTTUR

 

55523

 

59270

 

2 equal installment of 1506 MT from Feb 2023 to March, 23 for transferring to Maqsudapur/60301
6

 

57801

 

BARKHERA

 

19599

 

735 15595

 

350 MT in the month of Feb 2023 and 385 MT in the month of March, 23 for transferring to Barkhera/57801
3269 52401

 

PAWARWAD1

 

25922

 

43787

 

4 equal installment of 655 MT from Feb 2023 to May 2023 and 649 MT in the month of June 2023 for transferring to Barkhera/57801
7 57701 KHAMBARKH ERA 14596 14596 0 4 equal installment of 2920 MT from Feb 2023 to May 2023 and 2916 MT in the month of June 2023 for transferring to Khambarkhera/57701
8 60601 KUNDARKHI 1515 1515 0 63501

 

HA VIN AL

 

27207

 

33222

 

5 equal installment of 303 MT from Feb 2023 to June 2023 for transferring toKunderkhi/60601
9 60301 MAQSUDPUR 11278 4500 6778 4 equal installment of 1125 MT from Feb 2023 to May 2023 for transferring to Maqsudapur/60301
10

 

67201

 

SOUBHAGYAL AXMI

 

9767

 

4767 0

 

32501 ALAND 19286 24053 4 equal installment of 955 MT from April 2023 to July 2023 and 947 MT in the month of August for transferring to Soubhagyalaxmi/67201 (Aland/32501)
5000 24701 RAJESHWARAP URAM 4597 9597 2 equal installment of 1500 MT from April 2023 to May and 2 equal installment of 1000 MT from June 2023 to July 2023 for transferring to Soubhagvalaxmi/67201
11 62201 KODIYA 1731 1731 0 13801 BHAVANINAGA R 17025 18756 1731 MT in the month of Feb 2023 for transferring to Kodiya/62201
12 59101 RAJPURA 10000 10000 0 37501 SAMSHERPUR 63335 73335 5 equal installment of 2000 MT from February 2023 to June 2023 for transferring to Rajpura/59101
13 24201 THANDAVA 762 762 0 51901

 

 

MUDHOL

 

 

90197

 

 

92219

 

 

4 equal installment of 152 MT from March 2023 to June 2023 and 154 MT in the month of July for transferring to Thandava/24201
14 24301 VIJAYARAMA 697 697 0 4 equal installment of 139 MT from April 2023 to July 2023 and 141 MT in the month of August for transferring toVijayarama/24301
15 24101 ETIKOPPAKA 563 563 0  4 equal installment of 112 MT from Feb 2023 to May 2023 and 115 MT in the month of June for transferring to Tikoppaka/24101
16 2204 BULANDSHAH R 6675 6675 0 2208

 

BIJNOR

 

8355

 

18796

 

5 equal installment of 1335 MT from Feb 2023 to June 2023 for transferring to Bulandshahr/2204
17

 

3901

 

CHANDPUR

 

13308

 

3766 0

 

4 equal installment of 755 MT from Feb 2023 to May 2023 and 746 MT in the month of June for transferring to Chandpur/3901
9542 34501 DHANAURA 30458 40000 4 equal installment of 1910 MT from Feb 2023 to May 2023 and 1902 MT in the month of June for transferring to Chandpur/3901
18 15901 NAGEWADI 2301 2301 0 16701

 

Daulat

 

13904

 

19104

 

3 equal installment of 767 MT from March 2023 to May 2023 for transferring to Nagewadi/15901
19 33601 TASGAON 2899 2899 0 2 equal installment of 970 MT from Feb 2023 to March 2023 and 959 MT in the month of April for transferring to Tasgaon/33601
20 33901 MEHAM 6527 6527 0 68301 SRI SRI SUGAR 12087 18614 2 equal installment of 2222 MT from Feb 2023 to March 2023 and 2083 MT in the month of April, 23 for transferring to Meham/33901
21 60501 RUDHAULI 4926 4926 0 16501

 

BHOGAWATI

 

10908

 

19391

 

1135 MT in the month of April 2023, 2000 MT in May 2023 and 1791 MT in June 2023 for transferring to Rudhauli/60501
22

 

60901

 

ITAI MAIDA

 

8631

 

3557 0

 

2000 MT in the month of Feb 2023 and 1557 MT in month of March 2023 for transferring to Itai Maida/60901
5074 69059 Sangam nath 5433 10507 7 equal installment of 634 MT from Feb 2023 to August 2023 and 636 MT in the month of Sep 2023 for transferring to Itai Maida/60901
23

 

55601

 

KINAUNI

 

28327

 

1308 20000

 

16501 BHOGAWATI 19391 20699 443 MT in the month of March 2023 and 865 MT in April 2023 for transferring toKinauni/55601
7019 62101

 

BELLAD- BAGEWADI

 

30000

 

40000

 

5 equal installment of 1250 MT from Feb 2023 to June 2023 and 769 MT in the month of July 2023 for transferring to Kinauni/55601
24 8401 PRATAPPUR 2981 2981 0 481 MT in the month of June and 2 equal installment of 1250 MT from July 2023 to Aug 2023 for transferring to Pratappur/08401
25 35501 SantDamaji 5497 5497 0 52901 HAVARGAON 19099 24596 6 equal installment of 785 MT from Feb 2023 to July 2023 and 787 MT in the month of Aug, 2023 for transferring to SantDamiji/35501
26 40701 Jmampur 4845 4845 0 37601 Kaij 13975 18820 3 equal installment of 1211 MT from May 2023 to July 2023 and 1212 MT in the month of August 2023 for transferring to lmampur/40701
27 3702 CHILWARIA 6276 2500 3776 61601 UTTUR 59270 61770 2 equal installment of 800 MT from Feb 2023 to March 2023 and 900 MT in the month of April for transferring to Chilwaria/3702
28 6301 GOLA 5000 5000 0 54901 GAGAN 15788 20788 2 equal installment of 1667 MT from Feb 2023 to March 2023 and 1666 MT in the month of April for transferring to Gola/6301 (Gagan/54901)
29 60301 MAQSUDPUR 6778 6778 0 15401

 

SANGLI

 

78387

 

86778

 

6 equal installments of 968 MT from the month of Feb 2023 to July 2023 and 970 MT in the month of Aug 2023 transferring toMaqsudpur/60301
30 57801 BARKHERA 15595 1613 13982 4 equal installment of 322 MT from Feb 2023 to May 2023 and 325 MT in the month of June 2023 for transferring to Barkhera/57801
31 57801 BARKHERA 13982 13982 0 17901 PHALTAN 36018 50000 4 equal installment of 2795 MT from Feb 2023 to May 2023 and 2802 MT in the month of June 2023 for transferring to Barkhera/57801
32 1901 Sriganganagar 1449 1449 0 12901 SHRIGONDA 15652 17101 3 equal installments of 483 MT in the month of Feb 2023 to April 2023 transferring to Sriganganagar/1901.(Shri Gonda/12901)
33 39701

 

Shermau

 

18775

 

9992 3500

 

49201 LIBBERHERI 16958 26950 Mill-wise deduction/adjustment is not required in group sugar mills

 

 

34 5283 57401

 

PUDRI KHURD

 

29192

 

37068

 

35 59601 Khaikheri 13924 2593 11331
        197987           197987